S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
119. The authorization holder must send to the Minister, within the period provided for in section 100 of the Act, an end of activities report signed by an engineer including, in particular,
(1)  the number of the stratigraphic survey authorization;
(2)  the name and contact information of the licence holder;
(3)  the name and contact information of the enterprises that carried out the work;
(4)  the coordinates of the stratigraphic survey casing head on a plan provided by a land surveyor according to the NAD83 map reference system;
(5)  the measurements of the deviation of the stratigraphic survey path in dip, azimuth and depth, and the final coordinates of the bottom of the hole;
(6)  a summary of the work carried out in chronological order;
(7)  the start and end dates of the work;
(8)  a report on the cementing operations for each of the casing strings, containing, in particular,
(a)  the name and contact information of the enterprise that carried out the cementing work;
(b)  the type of cementing unit used and the method for applying the cement;
(c)  the type of cement used, its density, its additives and their proportions, the setting time and the volume used;
(d)  the cemented interval;
(e)  the composition and volume of the spacer fluid and the separating fluid used;
(f)  the circulation pressures;
(g)  the maximum pressure reached during cementing;
(h)  an indication that the casing check valve is functional or, if not, the propping pressure applied and the duration;
(i)  a description of the cement return, the quantity and the retreat, and if no return is observed, a description of the corrective actions taken;
(9)  the analysis results and the analysis certificates of the samples and fluid samples collected;
(10)  the well logs, in particular those interpreted, scaled in true vertical depth, and the corrections made;
(11)  the demonstration that the centralization of the casings complies with the Industry Recommended Practice, IRP: #25, Primary Cementing, published by the Drilling and Completions Committee;
(12)  the measured temperature and pressure to the final depth of the stratigraphic survey;
(13)  the data, recordings, results of the drill-stem tests, pressure and leak tests, leakoff test and their interpretation;
(14)  a geological description of the cuttings and drill cores, and a geotechnical description of the drill cores;
(15)  a comparative analysis of the work carried out compared with that provided for in the technical program and the results obtained compared with those anticipated;
(16)  the list of drill bits used, their type and the number of metres drilled by each of them;
(17)  the type of play encountered and a comparison with a similar play;
(18)  a lateral section of the stratigraphic survey after the sealing, according to the measured depth and the true vertical depth, signed and sealed by an engineer, indicating, in particular,
(a)  intersected groups, geological formations, lithological contacts and faults;
(b)  zones of abnormal pressure;
(c)  the diameter of the stratigraphic survey and the diameters of each casing;
(d)  the location of each of the casings;
(e)  if applicable, the depth interval of the open stratigraphic survey;
(f)  the type of plugs used and the depth intervals of each plug; and
(g)  the other equipment installed or dropped in the stratigraphic survey and not recovered;
(19)  the daily tour sheets;
(20)  if laboratory testing has been done on the cement after the granting of the authorization, the properties of the cement determined in the laboratory;
(21)  the technical reports prepared by the enterprises that carried out the work;
(22)  a technical description of the condition of the stratigraphic survey before the sealing;
(23)  in the case of the cement plugs used,
(a)  the name and contact information of the enterprise that carried out the cementing work;
(b)  the type of cementing unit used and the method for applying the cement;
(c)  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
(d)  the verified position of each of the plugs; and
(e)  if applicable, the analysis results and the analysis certificates of the samples collected;
(24)  the cutting depth of the casings under the surface;
(25)  a photograph of the ventilated steel plated welded at the top of the casings before the backfilling;
(26)  a plan showing the layout of the activity site after the restoration work; and
(27)  photographs of the entire restored activity site and of the plate installed in accordance with section 116.
O.C. 1252-2018, s. 119.
In force: 2018-09-20
119. The authorization holder must send to the Minister, within the period provided for in section 100 of the Act, an end of activities report signed by an engineer including, in particular,
(1)  the number of the stratigraphic survey authorization;
(2)  the name and contact information of the licence holder;
(3)  the name and contact information of the enterprises that carried out the work;
(4)  the coordinates of the stratigraphic survey casing head on a plan provided by a land surveyor according to the NAD83 map reference system;
(5)  the measurements of the deviation of the stratigraphic survey path in dip, azimuth and depth, and the final coordinates of the bottom of the hole;
(6)  a summary of the work carried out in chronological order;
(7)  the start and end dates of the work;
(8)  a report on the cementing operations for each of the casing strings, containing, in particular,
(a)  the name and contact information of the enterprise that carried out the cementing work;
(b)  the type of cementing unit used and the method for applying the cement;
(c)  the type of cement used, its density, its additives and their proportions, the setting time and the volume used;
(d)  the cemented interval;
(e)  the composition and volume of the spacer fluid and the separating fluid used;
(f)  the circulation pressures;
(g)  the maximum pressure reached during cementing;
(h)  an indication that the casing check valve is functional or, if not, the propping pressure applied and the duration;
(i)  a description of the cement return, the quantity and the retreat, and if no return is observed, a description of the corrective actions taken;
(9)  the analysis results and the analysis certificates of the samples and fluid samples collected;
(10)  the well logs, in particular those interpreted, scaled in true vertical depth, and the corrections made;
(11)  the demonstration that the centralization of the casings complies with the Industry Recommended Practice, IRP: #25, Primary Cementing, published by the Drilling and Completions Committee;
(12)  the measured temperature and pressure to the final depth of the stratigraphic survey;
(13)  the data, recordings, results of the drill-stem tests, pressure and leak tests, leakoff test and their interpretation;
(14)  a geological description of the cuttings and drill cores, and a geotechnical description of the drill cores;
(15)  a comparative analysis of the work carried out compared with that provided for in the technical program and the results obtained compared with those anticipated;
(16)  the list of drill bits used, their type and the number of metres drilled by each of them;
(17)  the type of play encountered and a comparison with a similar play;
(18)  a lateral section of the stratigraphic survey after the sealing, according to the measured depth and the true vertical depth, signed and sealed by an engineer, indicating, in particular,
(a)  intersected groups, geological formations, lithological contacts and faults;
(b)  zones of abnormal pressure;
(c)  the diameter of the stratigraphic survey and the diameters of each casing;
(d)  the location of each of the casings;
(e)  if applicable, the depth interval of the open stratigraphic survey;
(f)  the type of plugs used and the depth intervals of each plug; and
(g)  the other equipment installed or dropped in the stratigraphic survey and not recovered;
(19)  the daily tour sheets;
(20)  if laboratory testing has been done on the cement after the granting of the authorization, the properties of the cement determined in the laboratory;
(21)  the technical reports prepared by the enterprises that carried out the work;
(22)  a technical description of the condition of the stratigraphic survey before the sealing;
(23)  in the case of the cement plugs used,
(a)  the name and contact information of the enterprise that carried out the cementing work;
(b)  the type of cementing unit used and the method for applying the cement;
(c)  the type of cement used, its density, its additives and their proportions, its setting time and the volume used;
(d)  the verified position of each of the plugs; and
(e)  if applicable, the analysis results and the analysis certificates of the samples collected;
(24)  the cutting depth of the casings under the surface;
(25)  a photograph of the ventilated steel plated welded at the top of the casings before the backfilling;
(26)  a plan showing the layout of the activity site after the restoration work; and
(27)  photographs of the entire restored activity site and of the plate installed in accordance with section 116.
O.C. 1252-2018, s. 119.